Monday - September 21, 2026

Weather: 21°C

English Hindi

REGD.-HP-09-0015257

Facebook Twitter Whatsapp Insta Email Print
  • By Local Correspondent

KULLU — Terrified residents in the Sainj Valley fled their homes in the middle of the night after a sudden high-pressure leak in the 800-MW Parbati Hydroelectric Project Stage-II unleashed a torrent of water and muck into Palchara village.

The surge was triggered by an air-pressure valve failure near Adit 5, an access tunnel connected to the project's main head-race system.

The escaping water washed down tons of accumulated muck from an NHPC dumping site, engulfing local structures, damaging houses, temporary cafes, and agricultural fields before draining into a nearby stream.

District authorities stopped the leakage by shutting off the water supply and have deployed heavy earthmovers to clear the debris.

A joint inquiry committee chaired by the Sainj Tehsildar has been constituted to investigate whether safety protocols were breached and to oversee full compensation for the affected families.

 

Latest Stories
Sep 21
Sirmauri Conductor Killed in Hit-and- Run Case Near Toll Plaza on KMP Expressway

TRAGEDY ON KMP EXPRESSWAY: Sirmaur Conductor Kille...

Sep 18
Hailstorm Devastates Apple Crop in Shimla Belt

Hailstorm devastates Daroti apple belt in Tikkar,...

Sep 18
Police Investigators told to File Chargesheet By Plugging Lagal Loopholes

Vigilance investigators told to prepare draft char...